Thursday, March 08, 2007

Rough Plumbing

Bathrooms...


The rough plumbing is mostly completed in the bathrooms. We must wait for the flooring and tile before we can see the finished product. That is a little time away, but soon when rough plumbing, electrical and gas is done we will be able to insulate and sheet rock the walls.

This is plumbing for the sinks in the guest bathroom.


Gary built the frames for our tubs. The plumber set and plumbed them. This is Rachel's tub. It is a whirlpool tub.


This is our sorker tub. Gary decided to do a rounded tub frame. It was a challenge for him but he did well, I think.


Sink plumbing on each side of the tub.


These are shower and toilet drains which are not complete in this picture but have been completed. I will be getting more up to date picture this weekend. In addition to these pictures the hall bath downstairs is complete.