Day Two... Part Two...
Veneering the House and Laying Block for the Cellar Retaining Wall.
The crawl space is built with concrete block. To cover the block and also to be in line with historical guidelines, we could brick the block or paint it. Since bricking is one time and painting is not we voted for bricking.
They completed the right side of the house up to the front of the porch.
In the rear they had to build the retaining wall first and then brick.
They complete block and brick up the the beginning of the porch on the right side.
Above, the rear block and veneer are finished. Veneer on the one half of the left side and down the front are still to be finished. In the rear, all that is left is the chimney.